DECEMBER 2006
AIRCRAFT RECOVERY
San Pedro, CA

SCOPE OF WORK
C&W mobilized a dive support vessel on short notice
and traveled north to San Pedro, where employees
assisted the NTSB, the Los Angeles County Sheriff's
Department and the Los Angeles County Fire Department in
recovering an aircraft that had crashed a quarter mile
offshore from Cabrillo Beach. The aircraft was raised to
the surface by divers utilizing airbags. Once at the
surface the aircraft was hoisted onto the deck of the
M/V Elliott landing craft and transported to shore.
POINT OF CONTACT:
Aircraft Recovery Service
Jerry Prince
(661) 212-3996
APRIL 2006 - PRESENT
SAN ONOFRE NUCLEAR GENERATING STATION UNIT I
DECOMMISSIONING
San Onofre, CA
SCOPE OF WORK
C&W was approached by the SONGS decommisioning team
to assist them in permanently plugging the Unit 1 intake
and discharge conduits. Working in conjunction with
SONGS personnel, C&W developed and engineered a method
to remove piping obstruction and install a concrete plug
at the offshore side of the plant gates. The plug will
effectively block ocean water from entering the plant.
POINT OF CONTACT:
San Onofre Nuclear Generating Station
Mike Shephard
(949) 368-7202
JUNE 2006 - AUGUST 2006
GREEN MOUNTAIN POWER PLANT - TAILRACE STOPLOG
GUIDE REPAIRS
Kremmling, CO

SCOPE OF WORK
C&W mobilized to the site in June and set up
scaffolding and a dive platform from which to conduct
operations. The deteriorating stoplog guides at the
powerplant were cut and chipped to sound concrete before
rebar repair and placement of concrete and grout forms.
17' tall steel grout forms and 12' header plates were
fabricated in Denver and transported to the site, where
they were hoisted in place and fastened with over 100
linear feet of wet welding. Concrete and grout were
poured and finished to specifications. Through the use
of silt curtains and environmentally conscious work
practices, C&W protected the Blue River from turbidity
caused by construction activities.
POINT OF CONTACT:
US Bureau of Reclamation, Billings, MO.
Gerri Voto, Contracting Officer
(406) 247-7809
JUNE 2006
BAE PILE CAP WALL
San Diego, CA

SCOPE OF WORK
C&W constructed a pile cap wall for BAE Systems San
Diego Ship Repair. C&W workers assembled rebar, set up
anchors and formwork, and poured concrete. The wall has
allowed construction of a new paved parking area.
POINT OF CONTACT:
BAE Systems Ship Repair
Scott McKay
(619) 238-1000 ext. 3900
APRIL 2006
PECK ROAD GRAVEL PIT
Monrovia, CA
SCOPE OF WORK
C&W provided an emergency dive crew with mixed gas
diving capabilities to Peck Road Gravel in Monrovia,
California. Within 8 hours of being contacted by the
onsite representative, C&W mobilized a crew and all
equipment necessary to dive to 230 ft. in the gravel
pit.
POINT OF CONTACT:
Peck Road Gravel
Juan Yanez, Plant Manager
(626) 574-1855 |