PUDDINGSTONE DAM

San Dimas, CA

 

2007

 

SCOPE OF WORK

C&W worked with the Los Angeles County to make repairs to the intake structures at Puddingstone Dam. Ladders, landings, and fall protection were implemented in the control shaft, repairs were made to the intake tunnel lining, and the existing slide gates were replaced with a Rodney Hunt cast-iron slide gate. C&W collaborated with Triton Engineers to design a steel dewatering bulkhead for the intake tunnel, utilizing its extensive experience with flow control methods and knowledge in value engineering. C&W subcontractor Beard Electric installed the electric motor operator and associated electrical equipment.

 

POINT OF CONTACT:

Los Angeles County Department of Public Works

Perfecto Tobias, Construction Division

(626) 458-4954

 

JULY 2007 - AUGUST 2007

BARRETT LAKE DREDGING

Dulzura, CA

 

2007

 

SCOPE OF WORK

C&W worked with Orion Construction Corp. to replace valves at the Barrett Lake dam. More than 300 cubic yards of silt upstream of the dam were dredged using a submersible Toyo pump supported by a four-point anchor Flexi-Float barge, allowing C&W divers to locate and seal 30" and 16" valves previously hidden below the mud line. C&W has worked with the city of San Diego to implement a BMP (Best Management Practices) and SWPPP (Storm Water Pollution Prevention Plan) that protects water quality at the lake.

 

POINT OF CONTACT:

Orion Construction Corporation

Spencer Danks, Project Supervisor

(760) 597-9660

 

AUGUST 2007

SEAL BEACH NAVEL WEAPONS STATION CYCLOPEAN WALL REPAIR

Seal Beach, CA

 

2007

 

SCOPE OF WORK

C&W provided a mobile dive station, concrete mixer and pump to fill voids in a cyclopean wall at the Seal Beach Naval Weapons Station. Divers identified the areas of concern, fabricated concrete forms, and pumped repair concrete into the voids. C&W conducted in-water video inspection of the work.

 

POINT OF CONTACT:

R.E. Staite

John Sinclair, Project Supervisor

(619) 477-7900

 

2004 - PRESENT

DIVING SERVICES ON LAKE MATHEWS OUTLET TOWER

Riverside, CA

 

SCOPE OF WORK

C&W has performed underwater valve inspection and repairs on the new outlet tower since its construction. Work has included the removing and reinstallation of actuators and seal rings on the valves at depths in excess of 100 ffw.

 

POINT OF CONTACT:

JF Shea Construction, Inc

Pete Barotti

(714) 962-7577