C&W News (2017)

Jan-March 2017

o Southern California Edison (San Onofre Nuclear Generating Station, SONGS)

San Onofre , CA

 

 

 

SCOPE OF WORK

With the closing of SONGS in 2013 C&W continues to provide maintenance dive crews to the plant to provide inspection and repair to various structures and pumps inside the cooling water bays. In January and March of 2017 C&W dive teams removed damaged circulating pump screens in various areas and replaced them with new ones.

 

LOCATION: San Onofre Nuclear Generating Station 

PERFORMANCE PERIOD: Jan-March 2017

 

POINT OF CONTACT:

Vince Wenskoski 949-368-9281
 

June 19,2017

Lake Calavera City of Carlsbad, Intake Screen modifications

Carlsbad CA

 

 

SCOPE OF WORK

The system was leaking water from the reservoir at a steady rate and the City of Carlsbad planned to stop it by adjusting the elevation of the screens and servicing the butterfly valve at the opening.

 

REQUIREMENTS

C&W Mobilized a dive crew and support vessel with lifting capabilities to remove and reinstall new wedge wire screens from the dam outlet, a spool piece was added to the intake piping to raise the elevation of the screen.

 

LOCATION: Calavera reservoir, City of Carlsbad CA 

PERFORMANCE PERIOD: June 19,2017

 

POINT OF CONTACT:

Mark Biskup, City of Carlsbad 760-603-7352

 

C&W NEWS